• China GB/T5310 20g 20mng 25mng Cooling Seamless Steel Tube, Membrane Boiler Tube Parts
  • China GB/T5310 20g 20mng 25mng Cooling Seamless Steel Tube, Membrane Boiler Tube Parts
  • China GB/T5310 20g 20mng 25mng Cooling Seamless Steel Tube, Membrane Boiler Tube Parts
  • China GB/T5310 20g 20mng 25mng Cooling Seamless Steel Tube, Membrane Boiler Tube Parts
  • China GB/T5310 20g 20mng 25mng Cooling Seamless Steel Tube, Membrane Boiler Tube Parts
  • China GB/T5310 20g 20mng 25mng Cooling Seamless Steel Tube, Membrane Boiler Tube Parts

China GB/T5310 20g 20mng 25mng Cooling Seamless Steel Tube, Membrane Boiler Tube Parts

Customized: Non-Customized
Brand: Luzheng
Style: Steel Type
Fin Tube: Steel, Aluminum
Principle: Regenerative Heat Exchanger
Structure Material: Metal Material
Customization:
Gold Member Since 2014

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
boiler
Core
Aluminum Heat Exchanger
Type
Stainless Steel Heating Equipment
Application
Heater, Cooler, Vaporizer, Condenser
Ceramic Heating Equipment Type
Ceramic Electric Heater
Mixing Heat Exchanger Type
Gas Scrubber
Recuperative Heat Exchanger Type
Tube Type Heat Exchanger
Heat Transfer Surface
Tubular Heat Exchanger
Transport Package
Wooden Box
Specification
Steel fins
Trademark
luzheng
Origin
Shandong
HS Code
8404909000
Production Capacity
20000PCS Per Month

Product Description

Product Description:
China GB/T5310 20g 20mng 25mng Cooling Seamless Steel Tube, Membrane Boiler tube Parts
DESCRIPTION TUBE MATERIAL FIN MATERIAL TUBE SIZE
Extruded ,L-fin,G(Embedded) Fin tube

 
All Kind of Material can be applied Aluminum A1050,
A6061, A1100,
A1050,A1060,Copper C1100,C1220

12.70~50.8
High frequency Welded Finned
Tube H,HH
 
Carbon,Stainless  ,Alloy  Carbon,Stainless  ,Alloy
12.7~160
Integral Copper&Copper Alloy
High Finned Tube
C12200,C11000,C70600 C12200,C11000,
C70600
15.88~22.23
Oval Finned Tube,STUD FIN TUBE Carbon ,Stainless ,Alloy Steel Tube Carbon,Alloy.stainless Steel Tube
  All SIZE
  Available
Low Fin Tube Carbon Steel,Stainless Steel,
Titanium,copper,brass,nickel
Alloy,etc.

---

9.52~40
Turbo-C Tube
Turbo-E Tube
Corrugated Tube All Kind of Material --- 6.35~40
Membrane water wall carbon or alloy    

Company Info:
We are specialized in steel tube and fin tube for more than 10 years and have rich experience. Our factories has professional technicians and engineers, professional testing equipment, rich experience in delivery. We have more than 10 years of cooperative customers.We have four production bases. For usual sizes,we have stock ,so we can make quick delivery.Guarantee the quality and quantity of products, and guarantee the delivery time. The annual production of steel pipe and pipe fittings is 300000 tons, the annual fin tube production is 2 million meters, and the annual air cooler production is 15000 sets.
China GB/T5310 20g 20mng 25mng Cooling Seamless Steel Tube, Membrane Boiler Tube Parts

Production equipment:
China GB/T5310 20g 20mng 25mng Cooling Seamless Steel Tube, Membrane Boiler Tube Parts


Testing Machine:
China GB/T5310 20g 20mng 25mng Cooling Seamless Steel Tube, Membrane Boiler Tube Parts



Pipe Checking:

China GB/T5310 20g 20mng 25mng Cooling Seamless Steel Tube, Membrane Boiler Tube Parts
China GB/T5310 20g 20mng 25mng Cooling Seamless Steel Tube, Membrane Boiler Tube Parts
Package& Shipping:
China GB/T5310 20g 20mng 25mng Cooling Seamless Steel Tube, Membrane Boiler Tube PartsChina GB/T5310 20g 20mng 25mng Cooling Seamless Steel Tube, Membrane Boiler Tube Parts
China GB/T5310 20g 20mng 25mng Cooling Seamless Steel Tube, Membrane Boiler Tube Parts

Expo Show:
China GB/T5310 20g 20mng 25mng Cooling Seamless Steel Tube, Membrane Boiler Tube Parts


Customer Visit:
China GB/T5310 20g 20mng 25mng Cooling Seamless Steel Tube, Membrane Boiler Tube Parts

FAQ:
1. Q: I haven't done business with you guys before,how can I trust your company?
    A: Our company has been in STEEL TUBE and fin tube for 9, almost 10 years, which is longer than most  of our fellow suppliers, we've been golden suppliers for years. What's more, we've got quite a lot authority certificates, for example, CE, ISO9001, made in china onsite check certificate. I hope those above will be persuasive enough.
2. Q: What is the minimum order?
    A: Yes, our company mainly deals with wholesale deals, but if you insist buying one piece, or you just need one piece, we would be very likely to make the MOQ as 1 piece for you though.
3. Q: How can I get a sample to check your quality? How long can I get the sample?
    A: After price confirmed, FREE SAMPLE could be provided for your evaluation.
        After you confirm the sample details, the samples will be ready for delivery in 3-7days,and will be sent to you via express and arrive in 3-5days.
4. Q: What payment methods your company accept?
    A: We accept T/T, L/C, Western Union, Paypal.
5. Q: What's the shipment terms and delivery time of your company?
    A: FOB,CFR,CIF,15-60days
6. Q: Do you give any discount ?
    A: We'll surely try our best to help you get those by the best price and good service at the same time.
Contact:Zhiwei Wu (Will Wu)
 



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2014

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
Export Year
2012-03-01
Terms of Payment
LC, T/T