Product Description:
China factory Submerged arc welding boiler power station membrane water wall cooling steel tube
Submerged arc welding and gas shielded welding
The advantages of membrane wall are:
The membrane water wall has a complete protective effect on the furnace wall, so the furnace wall only needs thermal insulation materials instead of refractory materials, which greatly reduces the thickness and weight of the furnace wall, simplifies the furnace wall structure and reduces the total weight of the boiler
The membrane water wall also has good air tightness, can meet the requirements of positive pressure combustion for the boiler, is not easy to slagging, has less air leakage, reduces the heat loss of smoke exhaust and improves the thermal efficiency of the boiler.
We can aslo do other tubes as below:
DESCRIPTION |
TUBE MATERIAL |
FIN MATERIAL |
TUBE SIZE |
Extruded ,L-fin,G(Embedded) Fin tube
|
All Kind of Material can be applied |
Aluminum A1050,
A6061, A1100,
A1050,A1060,Copper C1100,C1220 |
12.70~50.8 |
High frequency Welded Finned
Tube H,HH
|
Carbon,Stainless ,Alloy |
Carbon,Stainless ,Alloy |
12.7~160 |
Integral Copper&Copper Alloy
High Finned Tube |
C12200,C11000,C70600 |
C12200,C11000,
C70600 |
15.88~22.23 |
Oval Finned Tube,STUD FIN TUBE |
Carbon ,Stainless ,Alloy Steel Tube |
Carbon,Alloy.stainless Steel Tube |
All SIZE
Available |
Low Fin Tube |
Carbon Steel,Stainless Steel,
Titanium,copper,brass,nickel
Alloy,etc. |
--- |
9.52~40 |
Turbo-C Tube |
Turbo-E Tube |
Corrugated Tube |
All Kind of Material |
--- |
6.35~40 |
Longitudinal fin tube |
carbon or alloy |
|
|
Company Info:
We are specialized in steel tube and fin tube for more than 10 years and have rich experience. Our factories has professional technicians and engineers, professional testing equipment, rich experience in delivery. We have more than 10 years of cooperative customers.We have four production bases. For usual sizes,we have stock ,so we can make quick delivery.Guarantee the quality and quantity of products, and guarantee the delivery time. The annual production of steel pipe and pipe fittings is 300000 tons, the annual fin tube production is 2 million meters, and the annual air cooler production is 15000 sets.
Production equipment:
Testing Machine:
Pipe Checking:
Package& Shipping:
Expo Show:
Customer Visit:
CERTIFICATE:
FAQ:
1. Q: I haven't done business with you guys before,how can I trust your company?
A: Our company has been in business of steel tube,fin tube for 9, almost 10 years, which is longer than most of our fellow suppliers, we've been golden suppliers for years. What's more, we've got quite a lot authority certificates, for example, CE, ISO9001, made in china onsite check certificate. I hope those above will be persuasive enough.
2. Q: What is the minimum order?
A: Yes, our company mainly deals with wholesale deals, but if you insist buying one piece, or you just need one piece, we would be very likely to make the MOQ as 1 piece for you though.
3. Q: How can I get a sample to check your quality? How long can I get the sample?
A: After price confirmed, FREE SAMPLE could be provided for your evaluation.
After you confirm the sample details, the samples will be ready for delivery in 3-7days,and will be sent to you via express and arrive in 3-5days.
4. Q: What payment methods your company accept?
A: We accept T/T, L/C, Western Union, Paypal.
5. Q: What's the shipment terms and delivery time of your company?
A: FOB,CFR,CIF,15-60days
6. Q: Do you give any discount ?
A: We'll surely try our best to help you get those by the best price and good service at the same time.