Seamless Steel Tubes En10216-3 P355ntc1 P355ntc2 P355nh P355n P355nl1 P33nl2 P460n

Product Details
Customization: Available
After-sales Service: Yes
Warranty: 1year
Manufacturer/Factory, Trading Company
Gold Member Since 2014

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Export Year
2012-03-01
Terms of Payment
LC, T/T
  • Seamless Steel Tubes En10216-3 P355ntc1 P355ntc2 P355nh P355n P355nl1 P33nl2 P460n
  • Seamless Steel Tubes En10216-3 P355ntc1 P355ntc2 P355nh P355n P355nl1 P33nl2 P460n
  • Seamless Steel Tubes En10216-3 P355ntc1 P355ntc2 P355nh P355n P355nl1 P33nl2 P460n
  • Seamless Steel Tubes En10216-3 P355ntc1 P355ntc2 P355nh P355n P355nl1 P33nl2 P460n
  • Seamless Steel Tubes En10216-3 P355ntc1 P355ntc2 P355nh P355n P355nl1 P33nl2 P460n
  • Seamless Steel Tubes En10216-3 P355ntc1 P355ntc2 P355nh P355n P355nl1 P33nl2 P460n
Find Similar Products

Basic Info.

Model NO.
pipe
Technique
Cold Drawn
Material
Carbon Steel
Surface Treatment
Black
Usage
Pipeline Transport, Boiler Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Special Purpose
Section Shape
Round
Transport Package
Bundles
Specification
od 17-914mm
Trademark
luzheng
Origin
Shandong
Production Capacity
5000tons Per Month

Product Description

Product Description:
China Factory Seamless steel tubes EN10216-3 P355NTC1 P355NTC2 P355NH P355N P355NL1 P33NL2 P460N
Type Seamless
Standard ASTM A106.ASME SA106,API 5L ,ASTM A53 ,ASME SA53,DIN17175,DIN1629/DIN2448,ASTM A179,ASME SA179,ASTM A192,ASME SA192,ASTM A210,ASME SA210 SA334,,ASTM A335 BS3059,BS3059 PART II GR.360,440,GR.620-460,GR.622-490,629-470,EN10216-1,-2,-3
Grade B,X42,X46,X52,X56,X60.ASME SA179,ASME SA192,ASME SA210 A1 C
ASME SA335-P5,P9,P11,P12,P15,P21,P22,P23,P91,P92.
ASME SA213-T2,T5,T9,T11,T12,T17,T21,T22,T23,T24,T36,T91,T92
DIN17175,ST35.8,ST45.8,17MN4,19MN5,15MO3,13CRMO44,10CRMO910,14MOV63,10CrMo5-5,13CrMo4-5.
EN10216-1,.P195TR1,P195TR2,P235TR1,P235TR2,P265TR1,P265TR2.
EN10216-2,P195GH,P235GH,P265GH,16MO3,25CRMO4 (TC1,TC2),EN10216-3,P355N,TC1,TC2,NH,NL1,NL2. P460N
GBT5310,20G.20MNG,25MNG,15MOG,20MOG,12CRMOG,15CRMOG,
12CR2MOG,12CR1MOVG,GR.3N,GR.6N,P275NL2,P355N,P355NL2,
OD  17.1-914mm
WT 1.5-100mm 
Length 1-12.9m random length,or Fixed length( 5.8m,5.85m,6m.11.8m.12m)
Min.Order quantity We can accept 1 pcs/size if we have stock.
Surface Clear oil varnish.or self color
Ends Plain ends,Bevels.
Payment term: TT or LC
Package Bundles or loose
Delivery time Depends on the specific orders,normally 45days
Company Info:
We are specialized in production of steel tube for more than 15 years and have rich experience. Our factories has professional technicians and engineers, professional testing equipment, rich experience in delivery. We have more than 10 years of cooperative customers.We have four production bases. For usual sizes,we have stock ,so we can make quick delivery.Guarantee the quality and quantity of products, and guarantee the delivery time. The annual steel pipe production is 300000 tons
Production equipment&Testing Machine:
Seamless Steel Tubes En10216-3 P355ntc1 P355ntc2 P355nh P355n P355nl1 P33nl2 P460n
Seamless Steel Tubes En10216-3 P355ntc1 P355ntc2 P355nh P355n P355nl1 P33nl2 P460n
Package& Shipping:
Seamless Steel Tubes En10216-3 P355ntc1 P355ntc2 P355nh P355n P355nl1 P33nl2 P460n
Seamless Steel Tubes En10216-3 P355ntc1 P355ntc2 P355nh P355n P355nl1 P33nl2 P460n
Expo Show&Customer Visit:
Seamless Steel Tubes En10216-3 P355ntc1 P355ntc2 P355nh P355n P355nl1 P33nl2 P460n
Seamless Steel Tubes En10216-3 P355ntc1 P355ntc2 P355nh P355n P355nl1 P33nl2 P460n
FAQ:
1. Q: I haven't done business with you guys before,how can I trust your company?
    A: Our company has been in production of steel pipes for 16, almost 17 years, which is longer than most  of our fellow suppliers, we've been golden suppliers for years. What's more, we've got quite a lot authority certificates,TUV PED CE, ISO9001.
2. Q: What is the minimum order?
    A: Yes, our company mainly deals with wholesale deals, but if you insist buying one piece, or you just need one piece, we would be very likely to make the MOQ as 1 piece for you though.
3. Q: How can I get a sample to check your quality? How long can I get the sample?
    A: After price confirmed, FREE SAMPLE could be provided for your evaluation.
        After you confirm the sample details, the samples will be ready for delivery in 3-7days,and will be sent to you via express and arrive in 3-5days.
4. Q: What payment methods your company accept?
    A: We accept T/T, L/C, Western Union, Paypal.
5. Q: What's the shipment terms and delivery time of your company?
    A: FOB,CFR,CIF,15-60days
6. Q: Do you give any discount ?
    A: We'll surely try our best to help you get those by the best price and good service at the same time.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier