ASME SA213 Steel Tube Superheater, T9 T11 T12 T91 T92 Boiler and Heat-Exchanegr Alloy Steel Tube

Product Details
Customization: Available
After-sales Service: Yes
Warranty: 1year
Manufacturer/Factory, Trading Company
Gold Member Since 2014

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Export Year
2012-03-01
Terms of Payment
LC, T/T
  • ASME SA213 Steel Tube Superheater, T9 T11 T12 T91 T92 Boiler and Heat-Exchanegr Alloy Steel Tube
  • ASME SA213 Steel Tube Superheater, T9 T11 T12 T91 T92 Boiler and Heat-Exchanegr Alloy Steel Tube
  • ASME SA213 Steel Tube Superheater, T9 T11 T12 T91 T92 Boiler and Heat-Exchanegr Alloy Steel Tube
  • ASME SA213 Steel Tube Superheater, T9 T11 T12 T91 T92 Boiler and Heat-Exchanegr Alloy Steel Tube
  • ASME SA213 Steel Tube Superheater, T9 T11 T12 T91 T92 Boiler and Heat-Exchanegr Alloy Steel Tube
  • ASME SA213 Steel Tube Superheater, T9 T11 T12 T91 T92 Boiler and Heat-Exchanegr Alloy Steel Tube
Find Similar Products

Basic Info.

Model NO.
asme sa213
Type
Seamless
Technique
Cold Drawn
Material
Alloy Steel
Surface Treatment
Varnishing
Usage
Pipeline Transport, Boiler Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Construction & Decoration, Special Purpose
Section Shape
Round
Boiler Tube
Asme SA213 or ASTM A213
Transport Package
Bundles or Loose
Specification
od 17-1060mm
Trademark
luzheng
Origin
China
Production Capacity
4000tons Per Month

Product Description

Product Description:
China manufacturer supplier ASME SA213 Steel Tube Superheater, T9 T11 T12 T91 T92 Boiler and heat-exchanegr Alloy Steel Tube
Item Details  
Type Seamless  
Standard ASTM A106.ASME SA106,API 5L ,ASTM A53 ,ASME SA53,DIN17175,DIN1629/DIN2448,ASTM A179,ASME SA179,ASTM A192,ASME SA192,ASTM A210,ASME SA210,ASTM A335 BS3059,BS3059 PART II GR.360,440,GR.620-460,GR.622-490,629-470  
Grade B,X42,X46,X52,X56,X60.ASME SA179,ASME SA192,ASME SA210 A1 C
ASME SA335-P5,P9,P11,P12,P15,P21,P22,P23,P91,P92.
ASME SA213-T2,T5,T9,T11,T12,T17,T21,T22,T23,T24,T36,T91,T92
DIN17175,ST35.8,ST45.8,17MN4,19MN5,15MO3,13CRMO44,10CRMO910,14MOV63
EN10216-1,.P195TR1,P195TR2,P235TR1,P235TR2,P265TR1,P265TR2.
EN10216-2,P195GH,P235GH,P265GH,16MO3,25CRMO4 (TC1,TC2)
GBT5310,20G.20MNG,25MNG,15MOG,20MOG,12CRMOG,15CRMOG,
12CR2MOG,12CR1MOVG,
 
OD  17.1-1422mm (3/8inch-56inch)  
WT 1.5-100mm   
Length 1-12.9m random length,or Fixed length( 5.8m,5.85m,6m.11.8m.12m)  
Min.Order quantity We can accept 1 pcs/size if we have stock.  
Surface ,Clear oil varnish.or self color  
Ends Plain ends,Bevels.  
Payment term: TT or LC  
Package Bundles or loose  
Delivery time Depends on the specific orders,normally 30-45days  
Company Info:
We are specialized in production of steel tube for more than 15 years and have rich experience. Our factories has professional technicians and engineers, professional testing equipment, rich experience in delivery. We have more than 10 years of cooperative customers.We have four production bases. For usual sizes,we have stock ,so we can make quick delivery.Guarantee the quality and quantity of products, and guarantee the delivery time. The annual steel pipe production is 300000 tons
Production equipment&Testing Machine:
ASME SA213 Steel Tube Superheater, T9 T11 T12 T91 T92 Boiler and Heat-Exchanegr Alloy Steel Tube
ASME SA213 Steel Tube Superheater, T9 T11 T12 T91 T92 Boiler and Heat-Exchanegr Alloy Steel Tube
Package& Shipping:
ASME SA213 Steel Tube Superheater, T9 T11 T12 T91 T92 Boiler and Heat-Exchanegr Alloy Steel Tube
ASME SA213 Steel Tube Superheater, T9 T11 T12 T91 T92 Boiler and Heat-Exchanegr Alloy Steel Tube
Expo Show&Customer Visit:
ASME SA213 Steel Tube Superheater, T9 T11 T12 T91 T92 Boiler and Heat-Exchanegr Alloy Steel Tube
ASME SA213 Steel Tube Superheater, T9 T11 T12 T91 T92 Boiler and Heat-Exchanegr Alloy Steel Tube
FAQ:
1. Q: I haven't done business with you guys before,how can I trust your company?
    A: Our company has been in production of steel pipes for 15, almost 16 years, which is longer than most  of our fellow suppliers, we've been golden suppliers for years. What's more, we've got quite a lot authority certificates, for example, CE, ISO9001, made in china onsite check certificate. I hope those above will be persuasive enough.
2. Q: What is the minimum order?
    A: Yes, our company mainly deals with wholesale deals, but if you insist buying one piece, or you just need one piece, we would be very likely to make the MOQ as 1 piece for you though.
3. Q: How can I get a sample to check your quality? How long can I get the sample?
    A: After price confirmed, FREE SAMPLE could be provided for your evaluation.
        After you confirm the sample details, the samples will be ready for delivery in 3-7days,and will be sent to you via express and arrive in 3-5days.
4. Q: What payment methods your company accept?
    A: We accept T/T, L/C, Western Union, Paypal.
5. Q: What's the shipment terms and delivery time of your company?
    A: FOB,CFR,CIF,15-60days
6. Q: Do you give any discount ?
    A: We'll surely try our best to help you get those by the best price and good service at the same time.

YOUR RELIABLE PARTNER FOR STEEL PIPES.WE OWN OVER 100 CUSTOMER IN WORLDWILD!
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier